Skip to content

Planning for phase 2 of twinning Highway 17 west begins


The second phase of twinning the Trans-Canada Highway west of Kenora has begun.

Preliminary design work of the 8.5 kilometer section between the road to Shoal Lake #39 and the Rush Bay weigh scales is taking place.

As well, a class environmental study to review the four lane alternatives for Highway 17 is also starting.

Ultimately a preferred option will be selected.

The first phase from the Manitoba Border to Highway 673 is already well underway.

Do you have a news tip?

Submit to ONNews@radioabl.ca.

loader-image
Kenora, CA
5:13 pm, Apr 30, 2026
weather icon 8°C
L: 7° H: 8°

What’s Trending